10 open remote senior construction scheduler roles from top companies and boards — updated hourly.
Remote Senior Construction Scheduler jobs: what to know
RemoShift tracks 10 live remote senior construction scheduler roles, refreshed every 30 minutes — every listing links straight to the original posting. Current openings come from Himalayas and include Turner & Townsend, Linesight, SOLV Energy and Arcadis plus other employers hiring this week.
By current openings, these roles hire mostly in the USA (8), the Philippines (1) and Canada (1). None of the current listings are flagged work-from-anywhere, so every role here is tied to a stated region or timezone — each posting spells out the arrangement.
The seniority mix runs senior (6) and mid (4), so the market skews toward senior roles — 60% of the current set. Of the 6 listings in the current sample that disclose pay, salaries run $115k–$120k with a median around $118k (USD, per year) — the rest keep ranges private, so filter for disclosed pay.
Live roles
10 live remote senior construction scheduler jobs
Top employers
Turner & Townsend, Linesight, SOLV Energy, Arcadis, Blue Water Thinking and Quanta Infrastructure Solutions Group
Common locations
the USA, the Philippines and Canada
Remote policy
Region/timezone-bound
Seniority mix
senior (6) and mid (4)
Typical pay
$115k–$120k (median $118k, 6 disclosed)
Frequently asked questions
How much do remote senior construction scheduler jobs pay?
Disclosed salaries for current remote senior construction scheduler listings run $115k–$120k (median $118k, USD per year), based on the 6 postings in our latest sample that publish a range. Only a minority of employers disclose pay — use the has-salary filter to see transparent postings first, and check each original listing for bonus or equity on top.
Are remote senior construction scheduler jobs open to candidates anywhere?
None of the current remote senior construction scheduler listings are work-from-anywhere: these roles are remote within a region or timezone. Openings concentrate in the USA, the Philippines and Canada, and each posting states the exact rule.
What seniority levels hire for remote senior construction scheduler roles?
Current listings skew senior (6) and mid (4) — senior roles alone are 60% of the set. Use the seniority filter to narrow the live list, and check each posting for the exact band and any experience floor.