Release Train Engineer

๐Ÿข Dynata ยท all Dynata jobs
๐Ÿ“ United States
๐Ÿ’ฐ USD 95,000 - 115,000 / annual
๐Ÿ“… Posted 2026-08-16 ยท via Himalayas
๐Ÿท Release-Train-Engineer,Agile-Coach,Scrum-Master,Program-Manager,SAFe-Practitioner,SAFeยฎ-Release-Train-Engineer,Release-Train-Engineering
Apply on original site โ†—

Lead, facilitate and coordinate the operation of the Agile Release Train (ART), ensuring quarterly synchronization between business and technology in assigned programs. Facilitate PI Planning events (pre-PI refinement, the 2-day event, Confidence Vote and ROAM exercise), the cross-team ceremonies during the increment (Scrum of Scrums, PO Sync, ART Sync and System Demo) and the Inspect & Adapt workshop at PI close โ€” ensuring plan compliance, cross-team dependency management and predictable delivery of business value in every Program Increment.
DIRECTLY INVOLVED IN THE FOLLOWING PROCESSES

-
Agile coaching services and SAFe framework adoption.

-
Facilitation and governance of PI Planning events.

-
Management of the ART operating rhythm (cross-team ceremonies).

-
Continuous improvement at program level (Inspect & Adapt).

-
Health, safety and work environment compliance.

Key Processes Supported

- Agile coaching and SAFe adoption

- PI Planning governance and facilitation

- ART operating rhythm management

- Program-level continuous improvement

-
Health, safety, and workplace compliance

ROLE REQUIREMENTS

-
Bachelorโ€™s degree in Computer Science, Engineering, Business Administration, or related field

-
Preferred graduate-level education in Agile Project Management, Organizational Transformation, or related disciplines

-
Minimum two (2) active SAFe / Agile certifications (SAFe RTE preferred).

-
5+ years leading software delivery programs

-
2+ years coordinating multiple teams at the program level

-
Minimum 3 PI Planning events facilitated or co-facilitated in any prior context.

KNOWLEDGE AND SKILLS โ€” TECHNOLOGIES

-
Backlog and planning: Jira (including Jira Plans), Azure DevOps, Linear. Familiarity with Dynata two-Jira-project model (PM board and Engineering board).

-
Visualization and Program Board: Miro, Mural, Lucidchart, Aha! Roadmaps.

-
Documentation and knowledge management: Confluence, Notion, SharePoint, Microsoft 365, Google Workspace.

-
Communication and collaboration: Microsoft Teams, Slack, Zoom, Google Meet.

-
Live polling and surveys: Mentimeter, Slido, Poll Everywhere (for Confidence Vote and PI Planning dynamics).

-
Metrics and dashboards: Tableau, Power BI, Jira Dashboards, EazyBI (reading and interpreting Predictability, Flow and Business Value metrics).

-
Spreadsheets and modeling: Excel, Google Sheets (Sprint Capacity Planner, capacity debt tracking, ad-hoc analysis).

-
Frameworks and methodologies: SAFe 6.0 (ART, Program Increment, PI Planning), Scrum, Kanban, Lean. Working knowledge of Dynata Product & Engineering Process (V1, May 2026).

GENERAL RESPONSIBILITIES

These are the strategic, ongoing accountabilities of the role. They apply continuously across every Program Increment. The responsibilities are grouped in two blocks: SAFe-canonical (what any RTE does anywhere) and Chapter-specific (what an RTE at Dynata does within the Chapter structure).
SAFe-canonical responsibilities

-
Own the ART operating rhythm end-to-end. The RTE is the single accountable owner of every cross-team ceremony that operates above the sprint level: pre-PI refinement, PI Planning, Scrum of Scrums, PO Sync, ART Sync, System Demo and Inspect & Adapt.

-
Be the single point of escalation for cross-team dependencies and impediments within the ART. Teams escalate to the RTE; the RTE escalates upward only when a decision is needed above the ART level.

-
Maintain the Program Board as the source of truth for what every team is committed to in the current PI. The Program Board is the RTE's primary artifact โ€” updated by them or by named delegates, never left stale.

-
Coach the PEMs, Tech Leads and Product Managers of the ART on the SAFe operating model. Coaching is delivered through observation, feedback and structured 1-on-1s โ€” not through training events.

-
Hold the trust relationship with the Business Owners of the ART. Business Owners must believe the RTE is operat

โ† All remote jobs